Health, Safety & Environmental Management

Walter Lilly considers safety to be the number one priority and dedicates substantial resource and time to ensure that everyone involved in our projects stays safe and healthy. Walter Lilly has a good safety record – and we work hard to keep it that way. The AIR for 2007 was 517.

The company is supported by the Health & Safety Department of our parent company, Renew Holdings plc. Regular site safety inspections are undertaken by the Regional Health & Safety Advisors.

Some of the regular measures taken are:

  1. All staff and operatives new to site undergo a thorough induction prior to starting work. This covers general and site specific risks.
  2. Risk Assessments and Method Statements are prepared for activities on site so that the risks can be identified and, where possible reduced or eliminated.
  3. Regular safety inspections on every site, carried out by our dedicated Safety Adviser. Advises sites of any nonconformance issues and suggests areas for improvement. After the inspection he prepares a report, which is circulated electronically to other key members of staff, who then monitor that any non-conformance issues are dealt with immediately. Our Construction Director also receives copies of these reports and reviews them immediately.
  4. All the production staff undertake informal site inspections of projects other than their own at regular intervals and the results of these are circulated to the site team involved.
  5. Regular toolbox talks are undertaken on site using the CITB GT700 Toolbox Talks.
  6. Our Construction Director meets regularly with the Safety Adviser and Safety Administrator to review trends and plan initiatives.
  7. All production staff undertake the CITB 5 day Site Management Safety Training Scheme, renewable every 5 years, 4 day First Aid at Work Course, renewable every 3 years and are CSCS card holders. Additional training is also undertaken as appropriate, for example Scaffold Inspection, CDM Regulations and Fire Co-ordination.
  8. All staff have access, via the company intranet to the CITB GE 700 Construction Site Safety Manual, CITB, DT700, Tool Box Talks, company policies, procedures, guidance documents and standard documentation.
  9. Walter Lilly has a Safety Committee that meets quarterly, comprised of members of staff from various parts of the business. This ensures that everyone in the company is involved in safety – on site and in the office. The committee meetings are chaired by te Construction Director with the Managing Director in attendance.

Environmental Management Policy

In carrying out our construction activities across multiple locations and in managing our headoffice functions at Waddon House, it is the policy of Walter Lilly to:

  • Identify and minimise the negative environmental impacts of our activities, prevent pollution and continually improve our environmental performance.
  • Acknowledge and meet our obligations to comply with the requirements of UK and EU legislation, local authorities, clients, landlords and the Renew Group stakeholders. Also we consider the requirements of our neighbours or other interested parties who may be indirectly associated with our business but directly associated with our environmental impact.
  • Set objectives and targets on an annual basis to improve our environmental performance.

    Implementation of this Policy is to include but is not exclusive to:

  • Designing our Environmental Management Systems to provide a tangible means of managing our environment related procedures, taking the following into account:      

              o The design of suitable management processes            

              o Provision of technology to ensure that approved information is available to staff.            

              o The promotion of environmental awareness and knowledge of the potential impacts caused by our construction activities and office based operations.

  • Communicating the progression of our Environmental Management System on a regular basis to our stakeholders through training, meetings, publications and one-off reporting.
  • Managing our supply chain, suppliers and design where appropriate to minimise the use of materials, energy or processes which may be harmful to the environment.
  • Promoting Walter Lilly as a sustainable business by conserving energy, materials and resources, minimising consumption, acting efficiently and effectively managing waste.
  • Managing the implementation of our policy through accreditation to ISO 14001.

Ron Bates

Walter Lilly – Managing Director